Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
MARAFIQ – GCS
Scroll Top

MARAFIQ

Project Details
1

Partial Replacement of Force Main Line Between IW 11 & IW 13 (1000 mm dia GRP Pipe, including butterfly valves 1000 mm dia, including concrete valve’s room, excavation, backfilling and dewatering.

  • Location:Yanbu
  • Started on: October 2007
  • Completed on: November 2008
  • Client:Marafiq