Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
ZOMOROD BEACH – GCS
Scroll Top

ZOMOROD BEACH

Project Details
1

Design of procurement & marina work, like dredging, construction of shoring side (rock protection of 15,000 m2, backfilling, marina for 5 bar lines with pile works. Construction of special decoration, R.C Building and walls, Manufacture, supply and install of pre-cast fence 2300 l.m at Al-Zomorod beach, the work includes construction of 75,000 m2 road works, excavation and backfilling, construction of 300 m2 pre cast building. Construction of Manholes, sidewalks, curbstone, pipe sleaves and culverts.

  • Location: Aziziah, Khobar, KSA
  • Started on: March 2003
  • Completed on: January 2004
  • Client: Special Investment (Al Oula Development)
Related Projects
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/gcscontracting/public_html/wp-includes/functions.php on line 5471