Deprecated: Optional parameter $list declared before required parameter $submit_text is implicitly treated as a required parameter in /home/gcscontracting/public_html/wp-content/plugins/yikes-inc-easy-mailchimp-extender/public/helpers.php on line 14
Ashar Tented Resort-RC Alula Project – GCS
Scroll Top

Ashar Tented Resort-RC Alula Project

Project Details
1

Turnkey luxury resort consisted of 47 villas (3 Bedroom, 2 Bedroom, 1 Bedroom), distributed in two wings (north wing and south wing), each wing includes pavilion building, back of house building, kitchen, and restaurants including equipment’s set up. the work includes all structural works, high finishing materials, swimming pools, MEP to the latest technology, HCAV, BMS and Security system, SPA facilities. The work includes also secondary infrastructure, all connections, tanks and biofilter facilities.

  • Location: Al Ula City.
  • Started on: July 2020
  • Completed on: July 2022
  • Client: Royal Commission for Al-Ula
Related Projects
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!