Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
JGC – GCS
Scroll Top

JGC

Project Details
1

Construction of Site office and Laydown Area. The works include prefabricated office buildings, 35000 square meters, Qty. 07 steel structure warehouse, with total area of 8,500 square meters, gantry crane (supply and installation) including civil works, chainlink fence, 4500 linear meter, all underground utilities, sewer, water, fire and electrical networks, asphalt works for 9,500 square meters, furniture and air conditions.

  • Location: Jubail City
  • Started on: November 2008
  • Completed on: July 2009
  • Client: Saudi Chevron and JGC Arabia Ltd.
Related Projects
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/gcscontracting/public_html/wp-includes/functions.php on line 5471