Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
MANIFAH GAS PLANT – GCS
Scroll Top

MANIFAH GAS PLANT

Project Details
1

Construction of Camps and Site Facilities at Manifah Field Causeway. The work includes but not limited to asphalt works including basecourse, fabrication, supply and erection of 20,000 meter square prefab units (Aramco and JGC camp and offices) including support facilities: kitchen, recreation, gymnasium, mosques, fully furnished including all equipments, A/C work, utilities, electrical works, including cables, panel boards, generators, street lighting, water network, including R.O. Plant, with capacity 2500 cubic meter per day, pipes, pumps, tanks, sewer network, including pipes, manholes, lift station, sea water intake pumps. It includes also date and telecommunication works, MATV System, including all equipments, plantations and irrigation system, sport facilities, sport area and car parking shades.

  • Location: Manifah Field Causeway
  • Started on: October 2008
  • Completed on: April 2009
  • Client: Saudi Aramco and JGC Arabia Ltd.
Related Projects
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/gcscontracting/public_html/wp-includes/functions.php on line 5471