Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
MINAH GENERAL HOSPITAL – GCS
Scroll Top

MINAH GENERAL HOSPITAL

Project Details
1

Procurement and construction of Mina General Hospital (500-Bed) at Makkah Al Mukarammah. The work includes only Skeleton, R.C. Concrete, construction of continuous footings 0.9, 1.0 and 1.3 m depth, columns, ground beams and ground slabs, excavation, insulation and design, manufacture and erection of pre-stressed hollow core slabs for an area of 62,000 m2.

  • Location: Makkah Al Mukarammah
  • Started on: June 2004
  • Completed on: March 2007
  • Client: Ministry of Health, Riyadh, KSA
Related Projects
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/gcscontracting/public_html/wp-includes/functions.php on line 5471