Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
YASREF project – GCS
Scroll Top

YASREF project

Project Details
1

Construction of Camp Facilities, Site Offices, 20,500 m2, including site preparation, boundary walls and security gates, walkways, furniture, Air conditionings, power plant (generators, transformers, MDB, SDB, cables network), light pole, water, sewer and fire utilities, which also includes tanks, pumps, swimming pool and gymnasium facilities, sport areas, landscape, steel structure warehouse 2800 m2, as well as all related civil works.

Work includes also the services and operation of the whole facilities for 5 years, not limited to: general maintenance, operation, camp management, medical services, catering and others.

  • Location: Yanbu, KSA
  • Started on: February 2011
  • Completed on: February 2012
  • Client: Saudi Aramco