Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
CONSTUCTION OF 45 IMMAM VILLAS – GCS
Scroll Top

CONSTUCTION OF 45 IMMAM VILLAS

Project Details
1

Construction of Housing Units at Jubail total qty 45 villas distributed in total 23 lots, with 280 m2 average area for each villa including: site preparation for all sites (excavation, backfilling, hardscape and landscape), concrete works (sub-structure and super-structure including footings, beams, columns, roof and all others), block works, plastering, paintings, finishing works : tiles all types, doors, windows and handrails, parking areas, all MEP works : lighting, plumbing, fire alarm, HVAC, power and all others.Which includes site preparation, foundation, structure ,lighting, HVAC system, fire alarm and firefighting system.

  • Location: Jubail, KSA
  • Completed on: October 2021
  • Client: Royal Commission of Jubail and Yaanbu
Related Projects
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/gcscontracting/public_html/wp-includes/functions.php on line 5471