Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
MANIFAH FIELD CAUSEWAY – GCS
Scroll Top

MANIFAH FIELD CAUSEWAY

Project Details
1

Construction of Temporary Camp and Site Facilities at Manifah Field Causeway. The work includes but not limited to earthwork, cut and fill 50 cm, compacting 15 cm thick marl and base course 20cm thick, asphalt 7 cm thickness and MCI, fabrication, supply and erection of 22,000 meter square prefab units (Aramco and JDN camp and offices) including support facilities: kitchen, recreation, gymnasium, mosques, fully furnished including all equipments, A/C work, utilities, electrical works, including cables, panel boards, generators, street lighting, water network, including R.O. Plant, pipes, pumps, tanks, sewer network, including Sewage Treatment Plant, pipes, manholes, lift station. It includes also date and telecommunication works, MATV System, including all equipments, plantations and irrigation system, sport facilities and sport area.

  • Location: Manifah Field Causeway
  • Started on: May 2007
  • Completed on: January 2008
  • Client:Jan De Nul and Saudi Aramco
Related Projects
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/gcscontracting/public_html/wp-includes/functions.php on line 5471