Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
Ashar Tented Resort-RC Alula Project – GCS
Scroll Top

Ashar Tented Resort-RC Alula Project

Project Details
1

Turnkey luxury resort consisted of 47 villas (3 Bedroom, 2 Bedroom, 1 Bedroom), distributed in two wings (north wing and south wing), each wing includes pavilion building, back of house building, kitchen, and restaurants including equipment’s set up. the work includes all structural works, high finishing materials, swimming pools, MEP to the latest technology, HCAV, BMS and Security system, SPA facilities. The work includes also secondary infrastructure, all connections, tanks and biofilter facilities.

  • Location: Al Ula City.
  • Started on: July 2020
  • Completed on: July 2022
  • Client: Royal Commission for Al-Ula
Related Projects
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/gcscontracting/public_html/wp-includes/functions.php on line 5471