Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
FADHILI TR – MAIN OFFICES AND LAYDOWN AREA – GCS
Scroll Top

FADHILI TR – MAIN OFFICES AND LAYDOWN AREA

Project Details
1

Construction of offices facilities for Saudi Aramco and Tecnicas Reunidas, 7,000 m2 including: site preparation, fence and gates, asphalt and walk ways, furniture and HVAC, complete utilities consisting of: water networks, firefighting networks, power networks, fire alarm system, piping, tanks, cables, lighting, generators, pumps and others. Also, construction of 8,000 m2 steel structure warehouses with 2,000 m2 closed refrigerated stores, complete with site preparation, fence and gates, asphalt and walk ways, furniture and HVAC, complete utilities consisting of: water networks, firefighting networks, power networks, fire alarm system, piping, tanks, cables, lighting, generators, pumps and others.

  • Location: Fadhili, KSA
  • Started on: May 2016
  • Completed on: April 2017
  • Client: Tecnicas Reunidas / Saudi Aramco
Related Projects
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/gcscontracting/public_html/wp-includes/functions.php on line 5471