Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
GE POWER TECHNOLOGY CENTER – GCS
Scroll Top

GE POWER TECHNOLOGY CENTER

Project Details
1

Site development including 30,000 LM, stone column, 9.0 meters height, excavation 350,000 m3 backfilling 225,000 m3, street and fence light, fence and gate, walkway, seawall and duct bank.

  • Location: 2nd Industrial City, Dammam, Saudi Arabia
  • Started on: November 2008
  • Completed on: July 2009
  • Client: General Electric
Related Projects
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/gcscontracting/public_html/wp-includes/functions.php on line 5471