Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
Government Security Complex – GCS
Scroll Top

Government Security Complex

Project Details
1

The project consists of one government security complex at Haradh area to accommodate facilities security forces (FSF) personnel, and three dispatch points located in Hawiyah, Uthmaniyah Gas Plant and Uthmaniyah GOSP – 6, as well as several offices and support facilities, as below:

  • Government Security Complex in Khurais + 3 DP.
  • Government Security Complex in Haradh + 3 DP.
  • Government Security Complex in Hawtah + 1 DP.
  • Government Security Complex in Khurais + 5 DP.

The government security complex shall consist of the below mentioned buildings with a design capacity of 205 personnel, and equipped with all required furniture, equipment, and accessories:

  • 5 Soldiers’ Accommodation Buildings.
  • Officers’ Accommodation Building.
  • Office Building.
  • Dining and Multipurpose Building.
  • Mosque.
  • Security Guard House.
  • Detention Room.
  • Gathering Tent.
  • Utility Building.
  • Generator Shed.
  • Irrigation Pump Shed.
  • Control Room.

β€’ Location: Khobar, KSA
β€’ Completed on: December 2023
β€’ Client: Saudi Aramco

Related Projects
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/gcscontracting/public_html/wp-includes/functions.php on line 5471