Project Details
1
Construction of site facilities for Tecnicas Reunidas, 17,000 m2 OF CAMP and Main offices facilities including: site preparation, fence and gates, asphalt and walk ways, furniture and HVAC, complete utilities consisting of: water networks, firefighting networks, power networks, fire alarm system, piping, tanks, cables, lighting, generators, pumps and others. Also, construction of 8,000 m2 steel structure warehouses with 800 m2 closed refrigerated stores, complete with site preparation, fence and gates, asphalt and walk ways, furniture and HVAC, complete utilities consisting of: water networks, firefighting networks, power networks, fire alarm system, piping, tanks, cables, lighting, generators, pumps and others.
- Location: Harad
- Started on: May 2018
- Completed on: July 2019
- Client: Tecnicas Reunidas / Saudi Aramco