Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
LOGISTIC BUILDING – SAUDI ARAMCO AND STAR – GCS
Scroll Top

LOGISTIC BUILDING – SAUDI ARAMCO AND STAR

Project Details
1

4000 m² one-story pre-cast blast-proof building that consists of a fire department, medical center, and a security center that allows the emergency shut-down of the entire operations of the world’s second largest world-class petrochemical plant, SADARA (Joint Venture between Saudi Aramco and the Dow Chemical Company).

Integrating the highest safety and quality standards and practices along with the latest planning and control industry practices for the most efficient and productive construction, project is comprised of a reinforced concrete structure, a steel structure (for the garage area which holds up to 6 fire trucks), and precast panels. Electromechanical items comprise of a complete fire-fighting system, HVAC duct system, BMS (Building Management System) and communication system, Chilled Water, Radioactive Bunker Storage, and much more, which are all elements are inspect-able as per the most stringent Oil and Gas Industry Standards.

Project also includes pre-commissioning and commissioning packages to assist the Client in initial operations, along with aesthetically pleasing architectural works.

  • Location: Dammam Port, KSA
  • Started on: August 2008
  • Completed on: July 2009
  • Client: SAIPEM
Related Projects
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/gcscontracting/public_html/wp-includes/functions.php on line 5471