Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
MARJAN INCREMENT PROGRAM – SINOPEC – GCS
Scroll Top

MARJAN INCREMENT PROGRAM – SINOPEC

Project Details
1

Construction of site facilities for Sinopec and Saudi Aramco 45,500 m2 land including: site preparation, fence and gates, asphalt and walk ways, 5,500 m2 office buildings for Saudi Aramco and Sinopec team, furniture and HVAC, complete utilities consisting of: water networks, firefighting networks, power networks, fire alarm system, piping, tanks, cables, lighting, generators, pumps and others. Also, construction of 2,000 m2 steel structure warehouses with site preparation, fence and gates, asphalt and walk ways, furniture and HVAC, complete utilities consisting of: water networks, firefighting networks, power networks, fire alarm system, piping, tanks, cables, lighting, generators, pumps and others

  • Location: Tanajib, KSA
  • Started on: December 2019
  • Completed on: August 2020
  • Client: Sinopec / Saudi Aramco
Related Projects
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/gcscontracting/public_html/wp-includes/functions.php on line 5471