Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
RAS AL KHAIR – GCS
Scroll Top

RAS AL KHAIR

Project Details
1

Major civil works contract for various reinforced concrete structures, at one of the Ma’aden Wa’ad Al Shamal Phosphate Company’s plants in Ras Al-Khair, which include eight [8] major tank foundations, overall site earthworks, pits and pump foundations, high voltage trench works, Substation building, storm-water pond works, roads and pavements, and much more.

Integrating the highest safety and quality standards and practices along with the latest planning and control industry practices for the most efficient and productive construction, this BOQ project contains approximately 40,600 mᶾ of concrete at various compressive strengths, among other major quantities for civil materials.

  • Location: Al-Khair, KSA
  • Started on: November 2014
  • Completed on: May 2016
  • Client: Dragados Gulf Construction Co. Ltd.