Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/gcscontracting/public_html/wp-includes/functions.php on line 6121
SADEEN PLAZA – GCS
Scroll Top

SADEEN PLAZA

Project Details
1

Construction of commercial complex with 15,000 m2 total BUA. 4,000 m2 which consists of 2 floors and a mezzanine, a building for an entertainment for 4 restaurants with an area of 3,000m2 including: 8,000m2 building consists of 3 floors- 1 floor of showrooms and 2 floors of offices, site preparation and land development including soil improvement, fence and gates, asphalt and walk ways, furniture and HVAC, complete utilities consisting of: water networks, firefighting networks, power networks, fire alarm system, piping, tanks, cables, lighting, generators, pumps and others.

  • Location: Al-Khobar
  • Completion: October 2020
  • Client: Sadeen Arabia-GCS
Related Projects
1
WE ARE THE LEADERS IN THE CONSTRUCTION INDUSTRY!

Notice: ob_end_flush(): Failed to send buffer of zlib output compression (0) in /home/gcscontracting/public_html/wp-includes/functions.php on line 5471